草久日本欧美亚洲日韩,操久久久久,av成人一区二区三区,乱理视频一区二三四五,211欧美大片一级,国产精品自在线,久久久久久免费高潮,精品一区啪啪啪啪网,国产激情区

Company news
  Boiler transformation
 

 

 

Transforming the old burner into biomass fuel burner. Take 1T evaporation for example,it costs about 60,000 Yuan for whole set equipment
30,000 Yuan for license
20,000~30,000 Yuan for transformation
20,000~30,000 Yuan for warehousing
About 150,000 Yuan for operation
Value calculation2 months for getting the principal back
ConclusionWe live in such a period that cost keeps raising while profit keeps declining. However,this enterprise can gain profit of 900,000 Yuan per year through transformation. And what about you?
 If you use boiler of 2T evaporation or more instead of 1Tyou are wasting money, nothing more. However, if you transform your equipment, you are just making profit.
Transformation of oil fired boiler and management of energy
Collecting customer’s daily consumption of water,electricity,fuel and labor and calculate the cost;
Making plan for reformation, renovation, recycling according to client information
Checking and verifying vestment and assessing detailed rules of project
Entering into a treaty of reformation and a contract custody of energy management
Taking over boiler equipment and carrying out plans including recording,transformation and acceptance
Project into operation
Value calculation and profit division
Difference
Main parts before transformationOil fired burner+ boiler body+ chimney
Main parts after transformationBiomass burner+ boiler body+ withdrawer+ dust collector+ draught fan+ chimney+ condensation collector
Heating efficiency88% before transformation,≥90% after transformation
Condensation recycling of transformation
Theory
Recollecting condensate water and tail gas generated by steam then recycling 85%~90% of its heatingwhich can reduce the consumption of fuel and water and save cost for enterprise.
Efficiency
Take 1Tevaporation boiler for example, the temperature can be raised140-20=120per hour*0.9*1000=108000KacL/h; 108000KacL/600000KacL*100%=18%
Cost saving
Fuel 75KG*0.18*5.00/KG≈67.50/小時(shí);waater 1T*2.86/TIncluding Waterborne fee*0.85≈2.5Yuan/Hour
10 hours per day:(67.5+2.5)*10=700.00元;
  21 days per month: 700.00/*21=14700.00元;
  Amount per year: 14700.00*12=176400元;
Condensation recycling of boiler transformation
Recycling the wasted steam and condensation with the unique equipment,for 1Tevaporationboilerthe budget cost of one whole set equipment is about 160,000 Yuan
30,000~40,000 Yuan for transformation project
200,000 Yuan for operation (belonging to vestment of fixed assets)
Value calculation: about 1 year to recover vestment cost
 
 
 
Author:  admin Addtime:  2012-6-19 Traffic: 4997
 
All rights reserved: Guangzhou your great heat equipment manufacturing Co., LTD address: guangdong guangzhou guangzhou city flower all area furong town first industrial park
09151747號-1TEL:020-28603999    FAX:020-86991071   Email:info@oshimagz.com
 
Service
Service
运城市| 龙泉市| 巴塘县| 星子县| 阆中市| 龙南县| 德化县| 海晏县| 布拖县| 莱州市| 富平县| 平顶山市| 侯马市| 阜康市| 武汉市| 全州县| 青海省| 铅山县| 太谷县| 禄丰县| 罗平县| 仪陇县| 峨眉山市| 吴堡县| 罗江县| 荆门市| 保德县| 江达县| 建始县| 盐亭县| 临泉县| 甘德县| 东方市| 黄骅市| 革吉县| 贵州省| 花莲县| 南皮县| 嘉定区| 庆安县| 静安区|